KATOEN NATIE PHOTOVOLTAIC PLANT PROJECT



Àliter Group carries out a photovoltaic plant installation at KATOEN NATIE IBERIA located in Tarragona. This plant has a total power of 158 kWp thanks to the implementation of 360 monocrystalline ...

PORTS DE LA GENERALITAT - Sant Carles de la Ràpita.



Amortization 5,1 years Specific production: 1.438 kWh / kWp / year Power 125,8 kWp; 100 kWn Capture area 660 m2 340 polycrystalline modules of 370 Wp Introduce you to the photovoltaic instal...

ANDRÉS PINTALUBA



Savings 27.4% Amortization 4.1 years Power 376.2 kWp; 300 kWn Capture area 2,212m2 1,140 330 Wp polycrystalline modules Introduce you to the photovoltaic installation for self-consumption of...

ADET



Savings 34.8% Amortization 4.9 years Power 31.68 kWp; 25 kWn Catchment area 186 m2 96 polycrystalline modules of 330 Wp Present the photovoltaic installation for self-consumption of 31.68 kW...

GRUP MICROS



35% savings Pay Back 4.4 years Power 73.92 kWp; 60kWn Capture area 435m2 224 polycrystalline modules of 330 Wp Introduce you to the photovoltaic installation for self-consumption of 73.92 kW...

PORGAOR



31% savings Amortization 5 years Power 110.88 kWp; 90 kWn Collection surface 652m2 336 polycrystalline modules of 330 Wp Introduce you to the 110.88 kWp self-consumption PV installation...

Reus Fleming, S.A.



39,6% savings. Power 114.2 kWp; 92.7kW 73.5 kWh lithium batteries. Collection surface 672m2. 346 polycrystalline modules of 330 Wp   Present the photovoltaic installation for self-consum...

Espai Sota Zero, self-consumption PV



Amortization 5.4 years. Power 125.7 kWp; 100 kW Collection area 762 m2. 381 polycrystalline modules 330 Wp . Production 181.7 MWh / year. Emission reduction 63,595 kg of CO2/year.  Present ...

AVIGAN, Self-consumption PV



Amortization 4,3 years. Power 403,9 kWp; 330kW. Surface of catchment 2.375m2. 1.224 polycrystalline modules of 330 Wp. Production 630 MWh/year. Reduction emissions of CO2  220.500 kg/year. ...
Aliter Group
Storm
Secartys
Solartys
Co-funded by the Horizon 2020
Ministerio de Economía, Industria y Competividad
AEI Cluster
Acció - Generalitat de Catalunya
Àliter Group - LEGAL NOTICE - COOKIES POLICY - SITEMAP - BY ANUNZIA